Moisture Barriers
In the 15 years of Service to regional Victoria Prosanding has become more focused on providing specific services to meet the customers needs.
- Have you ever been in a situation of having to lay new floor coverings on new concrete?
- Do you have rising damp through concrete and need to treat it?
- Oil over concrete prohibiting the installation of and sound surface?
Prosanding offer our services to install Aquron 2000 moisture barrier to cure these problems.
Aquron 2000 can be installed the same day the concrete is poured and can then have any surface laid only 28 days later.
For existing concrete with a high moisture content, any floor covering can be installed only 72 hours after the application of Aquron 2000.
Aquron 2000 can penetrate the surface up to 150mm resolving any moisture issues.
Some advantages of installing Aquron 2000.
- Permanently seals concrete from within.
- Prevents concrete damage resulting from chemicals, freezing, ingress of salts and carbonation.
- Strenghtens and hardens concrete surfaces, overcoming dusting, cracking and improves grip.
- Provides superior bonding for adhesive coatings.
- The full system can be applied in only one visit.